Sunday
Building 7: Omissions
From the "Cutting Room Floor"
Danny Jowenko has been in the demolition business for 27 years. He heads his own company.
The clip is in Dutch with subtitles. A very [revealing interview]
Two professors of structural engineering at Switzerland's most prestigious university reached a similar conclusion.
Professor Hugo Bachmann “ ... Building 7 was with the utmost probability brought down by controlled demolition” ... Professor Jorg Schneider “Building 7 was with the highest probability brought down by explosives”. [More]
Both at the Swiss Federal Institute of Technology in Zurich
Then we have Heikki Kurttila, accident analyst at the Finnish National Safety Technology Authority concluded a technical analysis with these Worcs. “The great speed of the collapse and the low value of of the resistance strongly suggests controlled demolition.”
Mayor Giuliani is on record saying the South Tower would collapse and vacated the Office of Emergency Management, OEM, in Building 7 prior to the event. Who warned the fire and police authorities or when, is not clear. There was significant failure of their walkie talkie systems partly due to the evacuation of the OEM.
However, someone from his office did tell Captain Michael Currid, President of the uniformed Fire Officers Association, that Building 7 would collapse and warnings were given to clear fire officers. Fire Chief Frank Fellini says “5 or 6 hours before the collapse”. Fire fighter Vincent Massa said “We hung around for hours waiting for 7 to come down”.
There’s lots of other things the BBC does not tell us
Try [Architects & Engineers 911Truth]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment